Edit in Forecast Plan
Edit the Values in Forecast Plan
· There are 3 ways in which the user can change/edit the values in Forecast Plan.
-
Edit Flag
-
Double Click on Cell.
-
Edit in Excel Sheet.
· To edit values in any Data Measure, the Edit Data option in the Data Measure Master must be set to True.
· Run the Work Flow to view the Forecast Plan.
· Go to Menu Bar --> Forecast --> Forecast Plan.
· Select the combination of Product and Region in the tree structure. Double-click on the cells of Data Measure which are editable.
· A window comes up in which the user has to change the value.
· The value can be changed in 4 ways,
-
Add – The same value gets added to the existing value.
-
Add Percentage – Add the percentage of the existing value.
-
Quantity – Entered value reflects directly in the cell.
-
Percentage – Enter the percentage of the existing value.
· Here we Add 361, which gets added to the existing value. The new value is 9000.
· Once this is saved, the cell of changed value appears green.
· Second method to edit the cell value is to click on Edit Flag and change the value.
· Enter the new value and save it. The cell of changed value is coloured green and after the page reloads, the cell colour will be white like before.
· Third way is to export the data to an Excel Sheet, Edit it and then Import it to the tool.
· Make sure the Data Type Should be ‘Data Measure as Column’. Click on Export Flag.
· The Excel Sheet opens with the data to be edited. Change the value of Final Forecast from 25 to 30.
· Save it and Import the sheet into the tool.
· The Final Forecast gets updated with the new value.